Fast Construction

The integrated system proposed by innovhousing necessarily leads to a sharp reduction in construction times.

Click to discover the reasons why this time-cutting is possible

1. The technological contribution inherent in the CLT manufacturing process that allows a quick erection of the structural part of the building.

2. The transition from conventional construction to a system that involves industrial and automation processes. From the design phase to the final installation stage, all phases are predictable, measurable and testable, and control over operations is carried out by a computerized network that allows monitoring regardless of location and distance.9fc52e

3. The use of skilled workforce throughout all stages of the process and especially in the assembly phase, greatly reduces the chance of errors or mismatches creating the conditions for a sharp increase in productivity. The assembly does not include on-site transformation, but is a highly binding process where each operation is the result of a predefined sequence with clear rules and verifiable standard times.